Operation News

Tan Cang Logistics operates two new cranes at Tan Cang Cat Lai terminal

16/12/2011

After two months of installation, two new cranes named Kocks were finished as plan. The inspections of quality and safety have been conducted according to the international standards. After completing the handover procedure, Tan Cang Logistics has officially taken into operating two new cranes, specific on 21st Nov (Kocks 1 at B6); and on 28th Nov (Kocks 2 at B7).

After two months of installation, two new cranes named Kocks were finished as plan. The inspections of quality and safety have been conducted according to the international standards. After completing the handover procedure, Tan Cang Logistics has officially taken into operating two new cranes, specific on 21st Nov (Kocks 1 at B6); and on 28th Nov (Kocks 2 at B7)
Two New cranes were manufactured with modern technology, designed capacity reach 40-45 cont/hour; the average productivity reached 110.000 teus/year/crane. Now Tan Cang – Cat Lai terminal has total 17 cranes to reduce the port stay and to affirm position and quality of service at Tan Cang - Cat Lai Terminal in terminal operation.